A client contacted us about an old Asbestos Nissen Hut removal they required carried out, these are not commonly found. The curved asbestos cement sheets were set in 2ft of the concrete base which had to be removed to fully remove the Asbestos Containing Materials.

The Nissen Hut had been disused for a number of years and had been fallen into disrepair. Our client had just purchased the property and land which the Nissen Hut resided and wanted to remove to install a new shelter for tools and lawnmower.

The asbestos removal which was carried out in Essex was agreed and the process explained with the client who was very happy with the time frame we were able to accommodate them in to remove the asbestos roof sheets, the contents and the concrete base.

The Asbestos cement sheeting was first removed under CAR 2012 regulations, wrapped and correctly disposed of. The wood panels to the front and rear were then removed and disposed of with the contents of the hut. 

The remaining base was then broken up and the and the last sections of asbestos cement sheeting removed.

1/14

Copyright © 2019 Advantage Environmental & Construction LTD - All Rights Reserved. bathroom renovation

 

Company Number:  11773995 

Upper Tier Waste Carriers License: CBDU285097

Part of the Advantage Group

Whatapp.jpg

WhatsApp Number: 0800 0016 339

  • Facebook Social Icon
  • Twitter Social Icon
  • Instagram
  • LinkedIn Social Icon
  • Pinterest